Most commercial manure and compost projects in Southeast Asia, Africa, the Middle East and Latin America start between 10,000 and 20,000 tonnes per year. At 300 working days and two 8-hour shifts, a 10,000 t/y plant runs at roughly 2–2.5 t/h. That is small enough to fit a 500–800 m² workshop and a single small dryer, but large enough to supply regional distributors with bagged product twelve months a year.
The number that matters is not the headline capacity. It is the capacity the line holds on the wettest, stickiest raw material your region delivers in the rainy season. Everything below is built around that constraint.
A 10,000 t/y organic fertilizer line has six stages. Skipping any one of them is the most common reason a new plant fails its first granulation test — usually because fermentation was rushed, moisture was never stabilised, or screening was deleted to save budget.
| Stage | Equipment | Typical Specification |
|---|---|---|
| 1. Fermentation and pre-treatment | Compost turner, hammer mill, ribbon mixer | 2.5–3.0 m self-propelled turner; 5–8 t/h crusher; 1–2 t batch mixer |
| 2. Granulation | Disc granulator or rotary drum granulator | Φ3.2–3.6 m disc, or Φ1.2×4 m drum; 2–3 t/h |
| 3. Drying | Rotary dryer + hot blast stove | Φ1.2×12 m, inlet 250–350 °C, outlet moisture below 15% |
| 4. Cooling | Rotary cooler | Φ1.0×10 m, discharge within 5 °C of ambient |
| 5. Screening | Trommel screen | 2–5 mm mesh, 3–5 t/h, oversize returned to crusher |
| 6. Coating and packing | Coating machine + automatic weigher | 1–2 t/h coater; 2–50 kg bagging with double-scale weighing |
The ranges below describe a standard carbon-steel configuration for a complete line, ex-works. They are budget planning figures, not a quotation: the final number depends on layout, automation level, stainless-steel content, dust-collection standard and destination port.
| Section | Budget Range (USD) |
|---|---|
| Pre-treatment (turner, crusher, mixer) | 18,000 – 35,000 |
| Granulation (disc, drum or roller press) | 12,000 – 45,000 |
| Drying and cooling with hot blast stove | 28,000 – 60,000 |
| Screening and coating | 8,000 – 16,000 |
| Packing machine | 6,000 – 15,000 |
| Conveyors, dust collection, steel structure | 10,000 – 22,000 |
| Electrical, PLC, installation materials | 6,000 – 14,000 |
| Total equipment | 88,000 – 207,000 |
Operating cost decides whether the plant is profitable; capex only decides how fast you get there. Drying fuel is the single largest lever, and it is the line item most often underestimated.
| Cost Item | USD per Tonne of Product |
|---|---|
| Raw material and fermentation loss (10–15% mass loss) | 10 – 40 |
| Electricity (28–35 kWh/t) | 3 – 5 |
| Drying fuel (coal, gas or biomass) | 8 – 25 |
| Labour (4–6 operators per shift) | 6 – 10 |
| Bags, pallets and packaging | 5 – 12 |
| Maintenance and spare parts | 3 – 6 |
| Total operating cost | 35 – 98 |
Bulk granular organic fertilizer typically leaves the plant gate at 120–220 USD/t, depending on nutrient content, packaging and the local distribution chain. Subtract the operating cost range above and the gross margin lands between 40 and 120 USD per tonne.
Anyone quoting a 6-month payback is pricing your output at retail and your downtime at zero.